Grass turf playground lawn non toxic indoor contact adhesive

$1.80 / Kilogram | 1000 Kilograms (Min. Order)
Quantity:
- + Kilograms available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
5 day(s) after payment received
Contact Supplier
Report Suspicious Activity
Overview
Quick Details
CAS No.:
7085-85-0
Other Names:
Choroprene Rubber
MF:
Mixture
EINECS No.:
230-391-5
Place of Origin:
Guangdong, China
Classification:
Volatile Solvent Adhesives
Main Raw Material:
Choroprene Rubber
Usage:
Construction, Fiber & Garment, Woodworking, Other
Brand Name:
Viland
Model Number:
PT-Contact Adhesive-RC
Type:
Lawn Glue
Name:
Choroprene Adhesive
Color:
Light Yellow
Appearance:
Yellow Paste
Packing:
Carton
Certificate:
SGS
Tack Time:
15min-2hours
Application:
woodworking
Weight:
0.68L/3L/4L/15L
Material:
Choroprene
Shelf life:
6 Months

Packaging & Delivery

Selling Units:
Single item
Single package size: 
18X15X10 cm
Single gross weight:
15.0 kg
Package Type:
Package:0.6kg/barrel 2.3kgs/barrel 3.5kgs/barrel 13kgs/barrel
Lead Time :
5

 

 

 

Wega grass glue

 

 

applicated artificial grass, carpet, PVC board ,all kinds of paving material and so on of one component adhesive Wega grass glue suitable for indoor paving of school ,kindergarden. Environmentally, safty and non-toxic.

 

Products Detail

 

Color

light yellow

TYPE

SPORT

MATERIAL

CR RESIN

SIZE

999

PACKING

15L

BRAND

WEGA

YIELD

100000KG/MOUTH

 

 

 

Wega grass glue with high heat resistance, long shelf life, convenient construction, waterproof and other excellent characteristics t, completely solve the traditional glue caused poor water resistance, aging resistance adhesive failure problem.

 

Products Feature

appearance

light yeallow liquid

VISCOSITY

2000-3000mpas

USAGE TEM

0-35

OPEN TIME(25℃)

30 MINS

STRENGTH TESTING (25℃)

24 HOURS

 

 

Usage:
1.Above indicators construction when the higher the temperature, the shorter the opening time, the faster the positioning.

2, When open and take out of the glue, should immediately sealed the packaging, and finish within 3 days.
3, For ensure good bonding of below several important factors: double-sided glue, glue quantity can't too little, 30 minutes after coating and laminating, compacte after 2 hours.

Construction procedure (recommended) :

The whole volume of lawn out first, smooth the air buy more than a few hours, to eliminate internal stress produced by winding packaging.

 

Brush adhesive: use a brush to brush glue evenly into the special interface and the corresponding artificial lawn on the back, in the open time pressing.
Paste artificial lawn: according to the lawn suppliers guidance, the shop is stuck the lawn.Blade coating glue, in the open time (25 , about 30 minutes), along the interface with the shop installs artificial lawn (recommend lawn within 30 minutes after brushing glue joint), to ensure sufficient bonding, should be in two hours after the brush glue (25 ) in the joint of lawn with a weight on a rolling compaction (or artificial with stamped on the real time), so as not to cause the lawn and the interface contact with insufficient phenomenon, adhesive unstable problem.About 2 days after the lawn can be put into use.
Usage: the amount of per square meter is about 0.1 kg.
Shelf life: under normal conditions, the original packaging not opened may be stored for at least 12 months.
Transportation and storage process, should be paid attention to prevent bask in

Wega grass glue

 

 

 

 

 

applicated artificial grass, carpet, PVC board ,all kinds of paving material and so on of one component adhesive Wega grass glue suitable for indoor paving of school ,kindergarden. Environmentally, safty and non-toxic.

 

 

 

Products Detail

 

 

 

Color

light yellow

TYPE

SPORT

MATERIAL

CR RESIN

SIZE

999

PACKING

15L

BRAND

WEGA

YIELD

100000KG/MOUTH

 

 

 

 

 

Wega grass glue with high heat resistance, long shelf life, convenient construction, waterproof and other excellent characteristics t, completely solve the traditional glue caused poor water resistance, aging resistance adhesive failure problem.

 

 

 

Products Feature

 

appearance

light yeallow liquid

VISCOSITY

2000-3000mpas

USAGE TEM

0-35

OPEN TIME(25℃)

30 MINS

STRENGTH TESTING (25℃)

24 HOURS

 

 

 

 

Usage:
1.Above indicators construction when the higher the temperature, the shorter the opening time, the faster the positioning.

 

2, When open and take out of the glue, should immediately sealed the packaging, and finish within 3 days.
3, For ensure good bonding of below several important factors: double-sided glue, glue quantity can't too little, 30 minutes after coating and laminating, compacte after 2 hours.

Construction procedure (recommended) :

 

The whole volume of lawn out first, smooth the air buy more than a few hours, to eliminate internal stress produced by winding packaging.

 

 

 

Brush adhesive: use a brush to brush glue evenly into the special interface and the corresponding artificial lawn on the back, in the open time pressing.
Paste artificial lawn: according to the lawn suppliers guidance, the shop is stuck the lawn.Blade coating glue, in the open time (25 , about 30 minutes), along the interface with the shop installs artificial lawn (recommend lawn within 30 minutes after brushing glue joint), to ensure sufficient bonding, should be in two hours after the brush glue (25 ) in the joint of lawn with a weight on a rolling compaction (or artificial with stamped on the real time), so as not to cause the lawn and the interface contact with insufficient phenomenon, adhesive unstable problem.About 2 days after the lawn can be put into use.
Usage: the amount of per square meter is about 0.1 kg.
Shelf life: under normal conditions, the original packaging not opened may be stored for at least 12 months.
Transportation and storage process, should be paid attention to prevent bask in

 

RFQ

Q1:What ‘s your product range?

1,Contact adhesive

2.PVA white glue

3.Silicone sealant

4.No more nail

5.Electronic white glue

 

Q2: Are you a manufacture?

Yes,we have beening in providing professional solutions on adhesive industry 20 years from 1995.

 

Q3: Do you have stock products to sell?

No,we work on ODM or OEM orders. That’s means size, material, quantily, design, packaging, solution ,etc will depend on your requests.

 

Q4:What information should I let you know if I want to get a quotation?

1,The size of packing.

2,The material & component data.

3,The quantity.

4,The certificate you need.

5.If it is prossible , please also provide with picure or design for checking. Sample will be best for charifying.If not ,we will recommend relevant products with detail for reference.

 

Q5:How many days will samples be finished? And how about the lead time of production?

Grenerally,3-5 days for samples making.The lead time of mass production will depand on quantity, production art etc.10-15 working days for 10 Tons.