Factory Price Office Stainless Steel Table Leg With Chrome Plating

  • 1000-4999 Pieces
    $0.85
  • >=5000 Pieces
    $0.79
Quantity:
- + Pieces available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
2 day(s) after payment received
Customization:
Customized logo (Min. Order: 5000 Pieces)
Contact Supplier
Report Suspicious Activity
Overview
Quick Details
Type:
Furniture Leg
Material:
Metal
Metal Type:
Stainless Steel
Use:
Table
Place of Origin:
Zhejiang, China
Brand Name:
OEM
Model Number:
M180413
Product Name:
Factory Price Office Stainless Steel Table Leg With Chrome Plating
Surface Finish:
Chrome Plating
Sample:
Free
Production Ability:
20years factory
Feature:
High precision, low tolerance, custom made
Advantage:
R&D ability, free design, all in one solution
Design Software:
Solidworks, cad, pro-e etc
Delivery:
3-5 days for samples, 3-4 weeks for mould
Shipment:
By sea, or air, or samples by express
MOQ:
500pcs

Packaging & Delivery

Selling Units:
Single item
Single package size: 
54X50X45 cm
Single gross weight:
12.0 kg
Lead Time :
Quantity(Piece) 1 - 10000 >10000
Est. Time(days) 2 To be negotiated

High Precision Customized 3D CAD Free Design Metal Stamping / Fabrication Metal Sheet Stamping /  Sheet-metal Forming

1.Detailed Info of Metal Stamping   

 Factory Price Office Stainless Steel Table Leg With Chrome Plating 
Feature1)      Various types of metal table leg
2)      Competitive price
3)      High quality metal table leg
4)      Prompt delivery

5)      Manufacture metal sofa legs according to the sizes and  designs   of customers.

6)      OEM.ODM.OBM orders are acceptable.
MaterialStainless steel 
usagetable 
Finish:1)      Light
2)      Chrome Polish(CP)
3)      Satin Chrome( SC)
4)      Matt
5)      others
Packing:Each pieces in a plastic bag,then put in carton or according to clients's instruction
Servicesamples can be supplied according to your requirements
warmly welcome to visit our factory
our goods checked QC systerm
reliable person to answer to your question in times
PaymentT/T,L/C
CertificationSGS,CE,ISO9001-2000

 

 

 

Company Information

 

What We Create

Q: Why choose DEAR?

 

Q: How to deal with your project/order?

Q: What type of plastic is best for my design/product?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.

 

Q. What type of mould tool do I need?
A. Mould tools can be either single cavity (one part at a time) or multi-cavity (2,4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10,000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend which would be best for you.

 

Q. I've decided to go ahead with my project. How long will it take to get my parts?
A. It can take 3-5 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like